Boiler replacement from A to Z
A new boiler looks like a simple purchase: you pick a model, the technician takes the old one off the wall and hangs the new one. In reality the boiler is only one part of the heating system, and how well it is matched to your house decides whether it will run economically and for a long time. In this article we describe the whole process step by step: what the technician has to inspect, how the boiler is chosen, why the system is flushed before installation and what happens on commissioning day. We hope this list will help you feel more confident when talking to any installer.
In brief
- Start with an on-site survey: the technician has to see the boiler room, the chimney, the gas inlet and the system.
- The boiler output is chosen to suit the house, not the old boiler.
- The system must be flushed before a new boiler is installed; manufacturers require this.
- A condensing boiler needs a condensate-resistant flue and a condensate drain to the sewer.
- The first start-up is done by a qualified specialist, who measures combustion and fills in the commissioning documents.
The whole process at a glance
Boiler replacement can be divided into six stages. Some take an hour, others a few days, but none of them should be skipped.
1. On-site survey
A good price quoted over the phone without a survey usually means that some of the work will only come to light on installation day. That is why the first step is a visit by the technician. During it the specialist should see:
- the boiler room or the place for the boiler: whether there is enough room for the new boiler and, if needed, a water heater, and whether there will be access for servicing;
- the chimney or flue: where and how the flue gases will be discharged, whether the old chimney is suitable, whether a liner or a new flue will be needed;
- the condensate drain: whether there is a sewer connection nearby;
- the gas pipework: whether it will need to be replaced or moved;
- the heating system: what radiators there are, whether there is underfloor heating, what condition the water is in, whether the system has been contaminated;
- the electrics: whether there is a suitable earthed socket nearby.
Tell the technician about the things that cannot be seen as well: whether the house has been renovated, how many people live in it, whether there is enough hot water, which rooms used to be cool. All of this helps to choose the right boiler.
2. Choosing the boiler
The boiler output is chosen according to how much heat the house needs now. If the house has been renovated, it may need considerably less output than the old boiler had. An oversized boiler switches on and off frequently, so it works inefficiently. You can estimate the output roughly with the calculator below, and there is more about this in the guide to boiler output.
Calculator: what boiler output you need
This is a guide for an initial choice, not a design calculation. For a combi boiler the output is often determined by hot water rather than heating. A technician calculates the exact output from the heat losses of the house.
The second question is hot water. A combi boiler heats water as it flows and takes up little space, while a boiler with a water heater stores water and is more convenient when people wash in several places at once. The third question is controls: a room thermostat or an outdoor temperature sensor lets the boiler work only as much as needed and saves gas. There is more about this in the guide to thermostats.
When you choose a new gas boiler for a house, it will almost always be a condensing boiler. EU Regulation 813/2013 has required a seasonal space heating efficiency of at least 86 % since 26 September 2015, and allows conventional boilers to be installed only in an exceptional case: for a shared natural-draught chimney in a block of flats.
3. Documents and permits
In Lithuania gas appliances are connected and commissioned by certified specialists. Whether replacing a boiler will require a design and handover of the work to the gas distribution operator depends on what changes: whether the boiler is moved, the gas pipework is altered, the output increases or the method of flue gas discharge changes. The specialist assesses this during the survey, and if a design is needed, it is prepared and approved by a certified company. We carry out this work as part of our gas and gas pipeline works service.
If you live in a block of flats, routing the flue through the façade or into a shared chimney may also have to be agreed with the homeowners' association or the building administrator. It is better to take care of this in advance so that the installation day is not postponed.
4. Preparing the system, flue and condensate drain
System flushing
Over many years sludge, rust particles and deposits build up in a heating system. The old boiler somehow got along with them, but a new condensing boiler has narrow channels and a sensitive heat exchanger. Manufacturers therefore require the system to be flushed before a new boiler is installed: in the Vaillant instructions, for example, this is listed as a mandatory installation step, and the pH of the water must be between 8,2 and 10. A filter with a magnet, which traps rust particles, is often fitted at the same time. We write more about this in the article "Heating system flushing".
Flue
The flue gases of a condensing boiler are cool and damp, and the condensate is slightly acidic. The flue therefore has to be made of condensate-resistant materials, usually plastic or stainless steel. An old masonry chimney is suitable for such a boiler only once a special liner has been fitted in it. A concentric flue is often used, in which the flue gases leave through the inner pipe and combustion air enters through the outer one. How a flue is chosen is explained in the guide to flues.
Condensate drain
A condensing boiler gives off water, which is led to the sewer through a trap. If the pipe runs outdoors, it must be of sufficient diameter and insulated so that it does not freeze in winter. A frozen condensate pipe is one of the most common reasons why a new boiler stops in cold weather.
5. Installation
On installation day the old boiler is disconnected and taken down, and the new pipework, flue and condensate drain are connected. Isolation valves and a filter are often fitted at the same time, sometimes also a new expansion vessel or a pump group. The system is then filled with water, air is bled from it and tightness is checked: of both the water and the gas connections.
Agree in advance who will take the old boiler away as well.
6. Commissioning and handover
The first start-up is a separate and very important job. Manufacturers' instructions state that it is carried out by a service specialist or another authorised, qualified person. During commissioning the flue type is set in the boiler, combustion (flue gas composition) is measured, gas pressure and tightness are checked, and a commissioning checklist or report is filled in. You will need this document later both for the warranty and for servicing.
Before leaving, the technician should show you how to operate the boiler: where to read the pressure, how to switch between summer and winter modes, what to do when an error code appears. Ask to be left the boiler manual, the warranty card and the commissioning documents. If the manufacturer requires the warranty to be registered, find out who will do it.
After replacement: annual servicing
A new boiler needs servicing just as much as an old one. Manufacturers specify that it should be done every year, and some tie the warranty terms to regular servicing. What exactly the technician does during an annual service is described in our article "Annual gas boiler servicing".
What to ask the installer
- Will you come to survey the site before giving a price?
- What boiler output do you propose, and why that one?
- What is included in the price: flue, condensate drain, filter, system flushing, removal of the old boiler?
- Will a design and handover be needed, and who will take care of them?
- Who will do the commissioning, and what documents will I receive?
- What is the warranty on the boiler and on the installation work?
- Who will do the annual servicing?
Frequently asked questions
Is a design needed when replacing a gas boiler?
It depends on the work. If the boiler location, the gas pipework, the output or the method of flue gas discharge changes, a design and handover of the work may be required. A certified specialist assesses this during the survey.
Why does the system have to be flushed before a new boiler is installed?
Sludge and rust particles that have built up in an old system can clog the heat exchanger of the new boiler and damage the pump. Manufacturers list flushing as an installation step.
Can a condensing boiler be connected to an old chimney?
Only if a condensate-resistant liner is fitted in the chimney or a new flue is installed. An ordinary masonry chimney without a liner is not suitable for a condensing boiler.
Who has to commission a new boiler?
A qualified specialist: the manufacturer's service or a technician authorised by it. During commissioning, combustion is measured and the documents you will need for the warranty are filled in.
Need a technician?
We have worked across Lithuania since 2016 and arrive with spare parts. Describe the situation or give us a call.
Our services
Sources
- Vaillant ecoTEC plus VU/VUW, installation and maintenance instructions, doc. 0020308118_05 (2023-05-31): installation, system flushing, water quality, commissioning
- Commission Regulation (EU) No 813/2013, Annex II
This article is general information. Always follow the manual of your own boiler, and leave work on gas and combustion components to a certified specialist.