Water supply pipework
We install and replace water pipework related to heating systems – heating circuit pipework, hot water supply lines, boiler and water heater connections and other heating-related pipework. All work is done by certified specialists, ensuring reliable, long-lasting system operation anywhere in Lithuania.
What water pipework do we do?
Heating circuit pipework. Laying new heating pipework and replacing or extending existing pipework.
Hot water supply lines. Laying hot water pipework from the water heater or boiler to the points of use.
Boiler and water heater connections. Connecting new boilers, heat pumps and water heaters to existing or new pipework.
Radiator connections. Connecting radiators to the heating system, moving or replacing them.
Underfloor heating manifold connections. Connecting the manifold to the heating system and pipework.
Pipework renovation. Replacing old, corroding or leaking pipes with new ones.
PIPEWORK INSTALLATION STAGES
When does pipework need replacing?
Old metal pipes. Old steel or cast-iron pipes rust, narrow and start to leak over time. Replacing them with new plastic or copper pipes solves the problem for a long time.
Frequent leaks. If the pipes often start leaking in different places, the system is worn out and needs to be replaced completely.
Renovation or reconstruction. When you are replacing floors or walls or doing a major renovation, it is the best time to replace old pipes as well.
Extending the system. Installing a new boiler, heat pump, water heater or additional radiators requires a new pipework connection.
Reduced water pressure. Scaled or narrowed pipes reduce the water pressure in the system.
Types of pipes
Plastic pipes (PP, PEX)
Light, corrosion-resistant and simple to install. PEX pipes are especially popular in underfloor heating systems because of their flexibility and durability. PP pipes are often used for hot water supply lines.
Copper pipes
Reliable and durable, they last for decades. They withstand high temperature and pressure, so they suit heating systems. A more expensive but long-term investment.
Stainless steel pipes
The highest-quality solution. Resistant to corrosion, mechanical damage and high temperature. Suitable for both heating and hot water systems.
Multilayer pipes (PE-AL-PE)
Flexible and easy to install, suitable for both cold and hot water. Thanks to the aluminium layer they hold their shape well and withstand temperature fluctuations.
FREQUENTLY ASKED QUESTIONS
Here you will find answers to some of the most frequently asked questions about laying water pipework.
Which pipes are best for a heating system?
It depends on the type of system and the budget. PEX pipes are used most often for underfloor heating circuits, and copper or multilayer pipes for heating mains. We choose the exact solution during the consultation.
Will the pipes be concealed in the walls or floors?
We discuss this with the customer before the work starts. Pipes can be concealed in wall chases or in the floor, or laid exposed with insulation. Each solution has its advantages depending on the situation.
How long does pipework installation take?
Depending on the scope of the work, a simple connection takes one day. Larger pipework installation or replacement jobs can take 2–5 days.
Do you travel anywhere in Lithuania?
Yes. We install and replace pipework across Lithuania. Get in touch and we will agree a convenient time for the visit.
Need new pipework or existing pipework replaced? Get in touch – we will assess the situation and carry out all the pipework properly anywhere in Lithuania.
OUR PARTNERS
We are official representatives of these companies:
Viessmann, Immergas, Vaillant, Sime, Baxi, Wolf, Protherm, Rotenso, Ravenheat, Bosch, Junkers, Buderus.
visukatiluremontas.lt – laying water pipework across Lithuania

