Natural gas connection
A natural gas connection is the most reliable and economical solution for homes that want to switch to mains gas. We do all the work from preparing the design to handing the system over to ESO – the customer does not have to deal with permits or documents. All work is done by licensed specialists in line with current safety requirements, anywhere in Lithuania.
ADVANTAGES OF NATURAL GAS
Economical heating
Natural gas is one of the cheapest energy sources for heating, especially compared with electricity or solid fuel.
Convenience
The mains gas supply works all year round without interruption. There is no need to worry about fuel stocks or refilling.
Fast heating
A gas boiler reaches the set temperature quickly and responds to commands from the control system.
Reliable supply
The natural gas supply does not depend on the weather or logistics – the system works without interruption.
A long-term solution
A properly installed gas system lasts for decades and needs minimal maintenance.
How the work is done:
1
DESIGN
We prepare the design in line with the regulations and submit it to ESO for approval.
1–2 weeks.
2
INSTALLATION
The gas pipeline is installed using yellow PE pipes (outdoors) and metal pipes (indoors).
1–3 days.
3
HANDOVER TO ESO
The system is handed over to the ESO inspector, tests are carried out and ESO turns on the gas supply.
1–2 weeks.
Stages of a natural gas connection
When is a natural gas connection needed?
A new house is being built and a gas heating system is being designed.
A house is being renovated and the owner wants to switch from solid fuel or electricity to gas.
There is already a gas pipeline on the plot, but the house is not yet connected.
You want to replace gas cylinders or a gas tank with mains gas.
A gas boiler is to be installed in a home that had no gas before.

Which permits and documents are needed?
A natural gas connection requires several documents and approvals. We handle the whole process, so the customer does not have to deal with the authorities:
Technical conditions
Issued by ESO; they set the connection requirements and parameters.
Gas connection design
Prepared in line with the technical conditions and approved by ESO.
Building permit
In some cases a permit for laying the gas pipeline is required.
Handover and acceptance certificate
Signed after the work is done; the system is officially handed over to ESO.
Gas meter installation documents
The meter is registered in the ESO system.
FREQUENTLY ASKED QUESTIONS
Here you will find answers to some of the most frequently asked questions about natural gas connection.
How long does a natural gas connection take?
It usually takes 2–4 weeks from the first consultation to the handover of the system to ESO. Most of that time is taken up by getting the documents approved by ESO. The installation work itself takes 1–3 days.
Do you take care of the documents and permits?
Yes. We handle all the paperwork: obtaining the technical conditions, preparing the design and getting it approved by ESO, and the handover and acceptance certificate. The customer does not have to deal with the authorities.
Can natural gas be connected on my plot?
That depends on whether a gas main runs near your plot. Get in touch – we will assess the situation and tell you whether a natural gas connection is possible on your plot.
What if there is no natural gas network in my area?
If there is no natural gas network, the alternatives are heating with gas cylinders, a gas tank or a heat pump. We will advise you and suggest the most suitable solution for your situation.
Want to connect your house to natural gas? Get in touch – we will assess the options, take care of all the documents and do the work anywhere in Lithuania.
OUR PARTNERS
We are official representatives of these companies:
Viessmann, Immergas, Vaillant, Sime, Baxi, Wolf, Protherm, Rotenso, Ravenheat, Bosch, Junkers, Buderus.
visukatiluremontas.lt – natural gas connection across Lithuania

